Pricing / fixed packages
Simple fixed pricing for rental room refresh files.
Choose the package that matches your room, unit, or operator set. Area confirms package fit. Standard projects do not receive surprise per-m² charges.
Prices are shown in IDR first. USD prices are estimates based on Rp18,000 per USD and may be reviewed monthly.
Bookable Room / pricing
Main packages
Three public packages cover standard rental-room refresh work. Unit Ready is highlighted when connected spaces need one coordinated guest-flow decision.
Entry offer
Room Audit
Rp1.490.000
$89 est.
Not ready for a full design pack? Start with a Room Audit. Your Room Audit payment is credited toward Room Ready or Unit Ready when you upgrade within 30 days.
SLA: 3 business days after complete photo submission.
Includes
- Room problem review
- Layout direction
- Style direction
- Missing input checklist
- Refresh action plan
- Budget risk notes
Excludes
- 3D render
- Contractor Handoff Documents
- Detailed drawings
- Kertas kerja
- Shopping list
Bookable Room / pricing
Fixed pricing for standard spaces
Bookable Room uses area to confirm the right package, not to create a running per-metre invoice.
Bookable Room uses fixed package pricing for standard spaces. Area helps confirm the right package. Most standard projects stay at the listed package price. Spaces outside the package limits receive a written scope review before payment. No surprise area charges are added after work starts.
Room Ready includes one room up to 20 m², with fair-use tolerance up to 22 m².
Unit Ready includes up to three connected zones and 35 m², with fair-use tolerance up to 38 m².
Operator Set includes four similar rooms up to 20 m² each.
Spaces outside these limits receive a written scope review before payment. No surprise area charges are added after work starts.
Room Ready
1 room, up to 20 m²
Up to 22 m² when scope remains one standard room with one primary function.
Unit Ready
2-3 connected zones, up to 35 m²
Up to 38 m² when scope remains one small unit or connected space group.
Operator Set
4 similar rooms, up to 20 m² each
Bookable Room / pricing
Add detailed build sheets
Need more technical files for vendor discussion? Add detailed build sheets after the design direction is approved. This prevents technical drawings from being redrawn after major design changes.
Build-sheet upgrade
Room Build Ready
Rp17.900.000
$995 est.
Includes everything in Room Ready plus technical sheets for one approved room direction.
- Dimensioned furniture layout
- Interior elevations
- Relevant sections
- Built-in furniture details
- Ceiling and lighting reference
- Material schedule
- RAB or BoQ structure
- Contractor notes
- Technical PDF sheet set
Build-sheet upgrade
Unit Build Ready
Rp29.900.000
$1,665 est.
Includes everything in Unit Ready plus detailed sheets for the agreed connected zones.
- Dimensioned furniture layout
- Interior elevations
- Relevant sections
- Built-in furniture details
- Ceiling and lighting reference
- Material schedule
- RAB or BoQ structure
- Contractor notes
- Technical PDF sheet set
Scope review
Operator Build Ready
Scope review
Operator Build Ready depends on room variation, site complexity, and required technical depth.
- Scope review
- Room variation check
- Site complexity review
- Technical depth confirmation
Kitchen, bathroom, extensive joinery, MEP coordination, structural work, permit drawings, and stamped documents remain outside the standard package.
Bookable Room / pricing
Add-ons
Optional items are quoted on top of the confirmed package when the operator needs more depth or faster delivery.
| Add-on | IDR | USD estimate |
|---|---|---|
| Extra render view | Rp1.000.000 | $55 |
| Shopping list with links | Rp1.500.000 | $85 |
| Measured elevation | Rp2.500.000 | $140 |
| Joinery detail | Rp4.500.000 | $250 |
| Extra revision round | Rp1.500.000 | $85 |
| Rush delivery | plus 30 percent | +30% |
Scope guardrail
When a scope review is needed
Edge cases route to a written scope review before payment, not rigid overage math.
Start with listing analysis- More than 35 m²
- More than three connected zones
- Kitchen or bathroom technical details
- Extensive custom joinery
- More than one design direction
- Incomplete measurements
- Different concepts across multiple rooms
- Structural or MEP requirements
- Permit or stamped documents
- Delivery under seven business days
- More than one revision round
Bookable Room / pricing
Pricing FAQ
Six common scope and pricing questions before Project Setup.